Kerbing and Concrete for Nelson Tasman Subdivisions: What Developers and Civil Contractors Should Specify
Kerb and channel in Nelson and Tasman subdivisions is built to the Nelson Tasman Land Development Manual (NTLDM), which both councils use.3,4 For developers and civil contractors, the main decisions are the council profile, how the channel drains to sumps, where the driveway crossings go, and whether the kerb is machine-laid. We lay slip-form and extruded kerb and channel to local council profiles.5
Which Standard Applies in Nelson and Tasman
The NTLDM sets requirements for roads, kerbs, channels, stormwater and accessways across Nelson City and Tasman District. A few of the numbers worth knowing:
Kerb grades must not be less than 1-in-250 (0.4%), so the channel keeps stormwater moving (see the
transportation chapter).
1The stormwater chapter sets a maximum distance between sumps of 100 m for standard kerb and 60 m for mountable kerb, and limits flow depth and velocity in the channel for vehicle safety (see the
stormwater chapter).
2Residential crossings in Nelson need a dropped kerb 3.5 m to 6.0 m wide, at least 7.5 m between crossings and one crossing per property, according to
Nelson City Council's guidance.
3
Always design to the current revision of the manual and your council's engineering approval. Our
kerb and channel profiles page includes the Nelson profile.
5Machine-Laid or Hand-Formed Kerb?
Slip-form and extruded machines lay a continuous kerb profile quickly and consistently, which suits long runs on roads and car parks. We were the first company in Christchurch to introduce slip-form and extruded kerbing, and those machines and the crew who run them now travel to Nelson.
5 Hand forming still has its place around corners, crossings and short runs. Read more in
Why Machine-Laid Kerbing Is The Best Choice For Large-Scale Projects.
How a Subdivision Concrete Package Runs
Earthworks, compaction and drainage are complete and signed off.
Kerb lines are set out to the approved levels.
Kerb and channel is laid, with crossings and sump locations built in.
Footpaths, crossings and car parks follow.
Levels and as-built records are checked against the approved plans.7
Plan the Driveway Crossings Early
Crossings are easier to build into new kerb than to cut in later. Because Nelson's residential crossings have set widths, spacing and a one-per-property limit, lot layouts and crossing positions should be settled before the kerb is laid.3 In Tasman, commercial accessways need a permit from the council.4
Prequalified and Site Safe
We're Site Safe accredited, hold a SiteWise Gold 100% rating and have completed a Prequal Tōtika assessment, so we're ready to work on council and civil sites.5
Questions to Ask Your Kerbing Contractor
Which council profile is this laid to
Is it machine-laid or hand-formed, and where does each apply
What's your programme, and how do you handle weather
How are levels and as-built records checked
What's included for crossings, sumps and footpaths
How do you handle travel and mobilisation to Nelson
Frequently Asked Questions
What standard applies to kerb and channel in Nelson and Tasman?
Both councils use the Nelson Tasman Land Development Manual (NTLDM) for roads, kerbs, channels, stormwater and accessways. Always check the current revision and your council's engineering approval before you design or build.3,4
What is the minimum kerb grade in Nelson Tasman?
The NTLDM's transportation chapter says kerb grades must not be less than 1-in-250, or 0.4%. That fall keeps stormwater moving along the channel to the sumps.1
How far apart can sumps be in Nelson Tasman?
The NTLDM stormwater chapter lists a maximum of 100 m between sumps for standard kerb and 60 m for mountable kerb. Confirm the figure in the current manual and with your engineer before you finalise a design.2
Why use machine-laid kerbing on a subdivision?
Slip-form and extruded machines lay a continuous profile quickly and consistently, which keeps long runs on programme. They suit roads, car parks and subdivision streets where the same profile repeats.
Does Letton work in Nelson and Tasman?
Yes. We lay kerb, channel and concrete in Nelson, Richmond, Stoke, Motueka and across Tasman, for subdivisions, councils, builders and homeowners.5
Do you supply ready-mix concrete?
No. We're a kerbing and concrete placing contractor. We prepare the site, form it up, and lay and finish the concrete.5
Sources
3. Vehicle Crossing Standards — Nelson City Council. Residential dropped kerb width of 3.5 m to 6.0 m, at least 7.5 m between crossings and one crossing per property. It also confirms the Nelson Tasman Land Development Manual as the governing standard.
5. Concrete Contractors in Nelson & Tasman — Letton Kerb & Channel. Slip-form and extruded kerbing, being the first company in Christchurch to introduce it, laying to local council profiles, Site Safe accreditation, the SiteWise Gold 100% rating, the Prequal Tōtika assessment, areas covered and that Letton doesn't supply ready-mix.
7. Nelson City Council Land Development Manual 2010 — Nelson City Council. The requirement for as-built plans to show kerbing. This is the older manual, which the Nelson Tasman manual now supersedes, so confirm the as-built requirements in the current version.