Concreting in Cold Weather: Frost, Freeze-Thaw and Winter Pours in Queenstown, Wanaka and Central Otago
Under NZS 3109, concrete shouldn't be placed when the ground is frozen, when the temperature is below 5°C and falling, or when it's below 2°C and rising. Fresh concrete also needs protecting from freezing until it reaches about 3.5 MPa.1,2 In Queenstown, Wanaka and Central Otago, where winter frosts are common, that shapes when and how a pour should happen.
Why Frost Damages Fresh Concrete
Water expands when it freezes, and that can seriously damage partly set concrete. In cold conditions cement hydration slows and concrete takes longer to gain strength. In most parts of NZ the critical period is the first 24 hours, particularly the first night.3
The NZS 3109 Limits
When the ground is frozen
At temperatures below 5°C with the temperature falling
At temperatures below 2°C with the temperature rising
Once concrete reaches a strength of about 3.5 MPa, it's usually considered strong enough to resist a freeze-thaw cycle. The limits exist to protect the concrete until then.1,2
What Good Cold-Weather Practice Looks Like
Never place concrete on frozen ground. It's usually possible to wait for the ground to warm up, or to protect the ground overnight with straw or a similar material.1,2
Protect the pour. Insulate the surface and edges until the concrete reaches about 3.5 MPa.1,2
Talk to your concrete supplier about the mix. Options include warm materials, air-entrained concrete and low-slump mixes.1,3
Follow the minimum formwork stripping times in NZS 3109, because stripping early can crack the surface.1
Watch the temperature difference. A gap of 20°C or more between the concrete and the air is commonly quoted as the point where surface cracking can occur.1
Keep curing. Concrete that dries out too fast loses strength and develops surface defects, even in cold weather.4
Planning a Winter Pour
The best protection is timing. Check the forecast for overnight lows, pick a morning with a rising temperature, and have covers ready before the pour starts. Shaded driveways and steep sites stay cold longer, which is another reason to ask your contractor how they'd handle the pour.
What Homeowners Should Ask
What's the overnight forecast, and will the pour go ahead
How will the concrete be protected after finishing
Is the ground frozen or at risk of freezing
What does the mix include for cold conditions, and who orders it
When will the formwork come off
Frequently Asked Questions
Can you pour concrete in winter in NZ?
Yes, with care. NZS 3109 says not to place concrete on frozen ground or in very cold conditions, and fresh concrete must be protected from freezing until it reaches about 3.5 MPa. Often the best option is to wait for a warmer day.1,2
What temperature is too cold to pour concrete?
NZS 3109 treats concrete placement as unfavourable below 5°C when the temperature is falling, and below 2°C when it's rising. Concrete also shouldn't be placed on frozen ground.1,2
How long does concrete need protecting from frost?
Fresh concrete needs protecting until it reaches about 3.5 MPa, the strength at which it can usually resist a freeze-thaw cycle. In most parts of NZ the critical period is the first 24 hours, especially the first night.1,2,3
Is it OK to pour concrete on frozen ground?
No. Concrete should never be placed on frozen ground. It's usually possible to wait for the ground temperature to rise, or to protect the ground overnight with straw or a similar insulating material.1,2
Does frost damage concrete after it has set?
Once concrete reaches about 3.5 MPa it can usually resist a freeze-thaw cycle. Long-term durability still depends on the mix, the finish and good curing, so ask your contractor and supplier how they plan for frost.1,2
Does Letton work in Queenstown, Wanaka and Cromwell?
Yes. We cover Wanaka, Queenstown, Cromwell and the wider Central Otago area. If your site is further out, call 03 344 1597 and we'll tell you whether we can help.5
Sources
1. Placing in Practice 1: Cold Weather Concreting — Concrete NZ. The NZS 3109 unfavourable cold conditions (frozen ground, below 5°C and falling, below 2°C and rising), the 3.5 MPa strength before concrete can resist a freeze-thaw cycle, protecting the ground with straw, warm materials, air-entrained concrete, formwork stripping times and the 20°C temperature differential.
3. Cold Weather Concreting — Allied Concrete. Why freezing damages partly set concrete, the first night being the critical period in most of NZ, and the mix precautions such as low slump, air entrainment and water-reducing admixtures.
4. Concreting over winter — Builders & Contractors. Curing practices in winter, and thermal stress from day and night temperature swings.